翻訳と辞書 |
Ambala Chandigarh Expressway : ウィキペディア英語版 | Ambala Chandigarh Expressway
Ambala Chandigarh Expressway is four-lane 35 km long,〔(【引用サイトリンク】title=Roads-GMR Ambala-Chandigarh Expressways Private Limited )〕 high-traffic density corridor of Ambala-Chandigarh section (km 5.735 to km 39.960 on NH-22 and 0 km to 0.871 km on NH 21) on BOT basis, was completed in 30 months at a cost of The expressway has been operational since December 2009 and was constructed by the GMR Group with assistance from the World Bank. ==See also==
* Ambala-Jagadhri highway
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Ambala Chandigarh Expressway」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|